Bridge 4:
This bridge crosses Stadium Way and connects to the French Administration Building.
Rail Height: 39" approx. Space Between Vertical Uprights: 6" Center to Center Total Height: 78" approx.
* The white banner shown is approximately 36"x 15ft.
Top of Page
Contact us: Webmaster | 509-335-9515 | Accessibility | Copyright | Policies College of Veterinary Medicine, Washington State University, Pullman, WA, 99164-7010 USA Copyright 1995-2001 Washington State University Revised October 23, 2001